Execution of Civil Works at Gas Turbine Power Station of Tyre, consisting:
2 Gas turbines 35 MW each with annexes, and 2 Fuel Tanks of 2.5000 m3 each.
Scopes: All Civil Works
Execution of Civil Works at Gas Turbine Power Station of Tyre, consisting:
2 Gas turbines 35 MW each with annexes, and 2 Fuel Tanks of 2.5000 m3 each.
Scopes: All Civil Works